Belgorod International Airport (named for V. G. Shukhov) EGO / UUOB
Belgorod, Belgorod Oblast · Russia · LLC 'International Airport Belgorod' (certified civil aerodrome operator since 2016); the airfield has been converted into a Russian Aerospace Forces (VKS) helicopter forward-operating base since 2022 and civil operations remain suspended by Ministry of Defence order
583kpax · 2021
Limited hoursInternational · no customs
ICAO / IATAUUOB / EGO
OperatorLLC 'International Airport Belgorod' (certified civil aerodrome operator since 2016); the airfield has been converted into a Russian Aerospace Forces (VKS) helicopter forward-operating base since 2022 and civil operations remain suspended by Ministry of Defence order
Coordinates50.6433°N, 36.5900°E
Elevation735 ft · 224 m
Time zoneMSK (UTC+3, no DST)
Passengers / yr582,531 (2021)
Customs—
Border control—
SchengenNo
Fuel—
Bonded—
AIP referenceUUOB — Russia AIP (Centre for Aeronautical Information / Rosaviatsia); airspace and airfield remain NOTAM-restricted, civil charts not current since Feb 2022
Operating hoursClosed to scheduled civil traffic since 24 Feb 2022 (indefinite suspension pending Russian Ministry of Defence clearance); the field previously ran 24-hour civil operations and remains active for state/military flights
TerminalsSingle passenger terminal, non-operational for civil traffic since February 2022
Runways (1)
- 11/29 · 2,500 m / 8,202 ft · 45 m wide · Asphalt concrete
Airport contact
Civil and scheduled passenger service has been indefinitely suspended since 24 February 2022 under Russian Ministry of Defence restrictions covering airports near the Ukrainian border; the airfield has since been converted into a forward operating base for Russian Aerospace Forces helicopter units. Belgorod city and its airfield have been repeatedly hit by cross-border drone and missile strikes through 2026, including a reported missile strike on the airport grounds in July 2026 that started a fire. Rosaviatsia named Belgorod among airports 'ready to reopen' pending Defence Ministry sign-off, as reported in November 2025, but no reopening date had been set as of September 2026, so the 582,531-passenger figure from 2021 is the last full pre-closure year and should be read as historical rather than current traffic.
Services
Available
On request / PPR
Seasonal / ageing
Unconfirmed / not listed
No service providers listed for this airport yet — airport details only.
Ground handling
Not listed
Aircraft fuel
Not listed
De-icing
Not listed
Part-145 line maintenance
Not listed
Part-145 base maintenance
Not listed
Component shops & overhaul
Not listed
Flight catering
Not listed
Aircraft cleaning
Not listed
Ground support equipment
Not listed
Cargo handling
Not listed
Aviation security
Not listed
Passenger & crew transport
Not listed
Flight support
Not listed
Hotel & travel
Not listed
AviatData